Products featured on the NeoEngress product pages remain the team's priority. Selected projects beyond those offerings are also undertaken. Given the team's limited capacity, these projects generally require longer production and delivery times unless a different schedule is agreed upon.
F/A-18 6 DoF motion frame
A lightweight F/A-18 cockpit frame for a customer-supplied 6 DoF motion platform, paired with a modified NACES design to give the motion system greater agility than it would have with the standard NACES. The frame and seat combination offers a platform for customers to rapidly assemble working motion simulators.
This project requires customers to source the motion platform separately and tune its motion-control parameters during final integration. The flight stick, throttle, pedals, and additional cockpit controls must also be sourced independently. Mechanical modifications may be required to adapt the structure to third-party universal joints and control panels.
F-16 style rudder slide
Customer-requested spring-loaded rudder slide originally intended for use with a specific rudder system. With its top mounting plate serving as an adapter layer, it may also provide a platform for pedals without built-in slides. The slide adds height beneath the pedals, so the floor structure originally beneath the pedals needs to be lowered to offset for the slide. The slide uses the same spring-loaded steel cable winch arrangement as the F-16 jet, with a cable-actuated pin latch for position adjustment.
Full-fidelity F-16, F/A-18, or F-35 rudder system builds may also be discussed with integrators.
F/A-18 full cockpit
A complete F/A-18 simulator cockpit designed and integrated around NeoEngress proprietary hardware. The system supports conventional screens and mixed reality. Full cockpit integration takes substantial time, and availability depends on the team's current workload. Feasibility for a new build is assessed through inquiry.
Project inquiries
Discuss a selected project
Projects shown here are evaluated individually. Scope, timing, and availability depend on current commitments and the work required. The inquiry form can carry the intended use, key requirements, quantity, and delivery destination for a feasibility review.